When a task has subtasks, Avaza adds up the estimates and the time logged on the task and all its subtasks, so you can see how the whole piece of work is going. There's nothing to switch on: the totals appear for every task that has at least one subtask.

Where to see the totals

  • List: in a project's List, hover over a parent task's time icon: the small progress circle, or the clock if the task has no estimate of its own.
  • Board: hover over the time section at the bottom of a card. The card itself still shows the task's own Estimate, Actual, Remaining and progress bar. A parent with no estimate of its own still gets a time section, with a dash for the missing estimate, so you can hover over it.
  • Task window: open the task and click its clock tab, Task Timesheets. This works wherever you open the task from, including My Tasks and All Tasks.

The time tooltips in My Tasks and All Tasks show only the task's own figures.

The List and Board tooltip has a row for This task, All subtasks (N) and Total, each with ESTIMATE, ACTUAL and REMAINING. N counts subtasks at every level, so it can be higher than the badge next to the task's title, which counts direct subtasks only. A task without subtasks shows just the This task row.

The Task Timesheets tab shows the same figures as three blocks, each with Estimated Hours, Actual, Remaining and its own progress bar: THIS TASK, ALL SUBTASKS (N) and TOTAL — THIS TASK + ALL SUBTASKS.

You see these figures if you can see a task's time. Project Collaborators who don't track time don't. If the totals can't load, you see Subtask totals unavailable.

How the totals are worked out

  • Total estimate is the task's own estimate plus the estimates of all its subtasks.
  • Total actual is the time logged on the task plus the time logged on all its subtasks, in every approval status, drafts included.
  • Remaining is the total estimate minus the total actual.

For a task with one subtask:

Estimate

Actual

Remaining

This task

10:00

8:00

2:00

All subtasks (1)

4:00

3:00

1:00

Total

14:00

11:00

3:00

  • Every level counts. Subtasks of subtasks are included. A subtask that has subtasks of its own shows the totals for its own branch.
  • Completed subtasks still count. Completing a subtask doesn't take its estimate or time out of the totals.
  • A missing estimate counts as 0:00. The time logged on that subtask still counts towards the actual.
  • Remaining can be negative. When the actual is more than the estimate, Remaining goes below zero, for example -2:00, and shows in red.
  • Filters and permissions don't change the totals. Every subtask is included, even one hidden by a filter or one you can't open.

When the figures change

The totals are worked out again each time you hover or open the tab, so they follow every change:

  • Estimate or time: change the estimate, or add, edit or delete a timesheet entry, and the Task Timesheets tab updates.
  • Moving a subtask to another parent: the old parent's totals drop it, and the new parent's totals include it.
  • Deleting a subtask: its estimate leaves the totals. A task with time logged on it can't be deleted, so remove its timesheet entries first. Deleting is permanent, with no restore: see recovering deleted data.
  • Moving a parent to another project: its subtasks go with it, so its totals stay the same. A task only moves while neither it nor its subtasks have time logged: see moving tasks between projects.

Changing a parent's Estimated Effort (hours) on the Task Timesheets tab changes only that task's own estimate, never its subtasks' estimates.

The Timesheet entries list on the tab shows only the entries on the task itself, marked "on this task". Time on its subtasks counts in the ALL SUBTASKS and TOTAL figures, but to see those entries, open the subtask. If your role shows you only your own entries, the figures still include everyone's time.

What the totals don't change

The roll-up is shown on screen only. It doesn't change:

  • the section and project totals in the List and Board, and it never counts time twice;
  • budgets, billable amounts or invoices;
  • reports and the task export: they don't include the rolled-up totals (see the Task List report);
  • the API: a task's EstimatedEffort and ActualTime are still its own figures (see the Avaza API).